欧美黑人性暴力猛交喷水黑人巨大-国产激情久久久久影院老熟女-91麻豆免费国产在线-亚洲一区二区三区在线视频观看-亚洲精品国产成人片在线观看-韩国成人av免费一区二区-日本特级淫片免费看-国产精品亚洲一区二区三区在线-毛茸茸性xxxx毛茸茸毛茸茸

News

Drilling of Hilong’s Comprehensive Technical Service Well Rajani-5 Starts

Date 2016-03-23

(March 23, 2016, Shanghai) Hilong Oil Service & Engineering Pakistan (Private) Ltd. successfully started an integrated service project to drill well Rajani-5 on March 21, 2016, with drilling fluid, directional drilling and bits services.
 

The designed TD of Rajani-5 is over 14000ft, estimated bottom hole temperature(BHT) is as high as 170℃, the highest mud weight is as high as 14ppg. It is a rare deep and high-temperature well in Rajani block, giving extreme difficulty to drill.
 

Hilong introduced UEPL with customized solutions of drilling fluid, directional drilling and bits in the 2nd half of 2015. After a number of technical exchanges and business trip to Hilong, UEPL released PO to Hilong to provide integrated service of well Rajani-5.

 

Dai Daliang, senior vice president of Hilong Group and general manager of Oil Service Business said, “the Rajani-5 well is the first oversea integrated oil service project of Hilong, marking a big step forward on the part of Hilong towards becoming an integrated oil service supplier.”

The Site of the Rajani-5 Well